News

September 2022

The trapeze-shaped sheet metal on the ceilings and roofs of the towers has been removed. We have made openings in load-bearing walls and created the portal to the southern elevator; the foundation slab for the elevator in the northern tower has been laid, waterproofing has been completed, and the load-bearing wall has been constructed. We also installed steel columns by the pool.